Library Record
Images

Metadata
Object Name |
Newspaper |
Object ID |
38.20 |
Title |
Preliminary sketches of bike path 'very detailed' |
Author |
Liz Freeman |
Publisher |
Captiva Current |
Published Date |
10/30/1992 |
Collection |
Captiva Safety Corridor Collection |
Search Terms |
Safety Corridor bicycle |
Summary |
A preliminary sketch showing where a bike path could be built in Captiva from Blind Pass Bridge to the existing path has been prepared, and members of the Captiva Civic Association are preparing to contact property owners for their input. The preliminary sketch has the bike path on the bay side of Captiva Drive from Blind Pass Bridge through the S-curve, then switched to the other side of the road. |
People |
Bates, John |